Network Rail


Network Rail, Eastbourne

Size: 4 kWp System

Modules: 230W

Inverter: SMA 4000TL

Annual Output: 4100kWh/year


Eco-Kinetics was successful in winning a tender for the installation of a trial system at one of Network Rail’s maintenance depots, which along with other energy reduction measures will help to reduce energy costs and carbon emissions at the site.
The system comprises of 17.no 230W modules mounted to a tilt frame mounting system. The system was installed above the modular office and welfare blocks serving the site. A bespoke design solution which had to be non-penetrative was supplied for approval at the tender stage.

The system is served by an SMA 4000TL single phase inverter and SMA Webbox, which relays data via a GSM mobile connection to the client’s and our O&M team, enabling us to monitor the system, ensuring that maximum performance is achieved at all times. A public display was also installed within the reception area of the site to allow visitors to see the system in operation.