The Camp


The Camp, Herts

Size: 38 kWp System

Modules: 230W

Inverter: SMA 12000TLx 3

Annual Output: 34500kWh/year


The system comprising of 165.no 230W modules is mounted to a Wurth supplied, rolling ridge mounting system. The project was completed in 4 days by a team of 4 installers with the total project time from the design to commissioning being seven weeks.

The system is served by 3x SMA 12000TL Tri-power series inverters which are connected to the client’s electrical system via a new 3-phase distribution board. An SMA Webbox was fitted which relays data via a GSM mobile connection to the client and our O&M team, enabling us to monitor the system, ensuring that maximum performance is achieved at all times. The system will save nearly 18 Tonnes of carbon emissions annually and will help the client reduce the cost of running grain drying equipment at the site.


“Eco-Kinetics installed two solar PV systems on our farm totalling 50kWP. Both installations were completed to high standards within a tight timeframe. They have been exceptionally responsive to all our needs and a delight to work with. The panels have produced at or above our expectations and have worked perfectly. The monitoring system that Eco-Kinetics installed makes it very easy for us to track performance in real time. I would not hesitate to use them again”.
~ Johnny Carew-Pole, North Mymms Cricket Club